# CSAPR (TR1) and NODA comments controls:  some ADDITIONAL, some REPLACEment
# All compliance dates are before July 1, 2014
#  see /garnet/home/rhc/2012cs/mk_non_consent_decrees_TR1_2012cs_2014cs_google_CNTL_CLOS_PROJ_packets.sas for data details
# Updated for 2007v5 to remove pre-2008 controls and controls that are no longer needed because 2008NEI is less than CSAPR commments post-control
# THIS PACKET FINALLY created by R. Mason using: mk_CSAPR_CONTROL_w_TCEQ_2020oilgas.sas
# THIS PACKET DOES NOT CONTAIN NONPOINT SOURCE CONTROLS
# NONPOINT CONTROL and 1 unit for ptnonipm growth (WV) are in separate packets
# Variables:  FIPs,SCC,POLL,dummy var, Control Efficiency %, rule eff/pen % ,SIC,MACT,APPFLAG,REPFLAG,plantid,pointid,stackid,segment,compliance_date, comments
06071,,NOX,,56,,,,,Y,A,4841311,85483212,,,"! total NOX at 2 kilns must equal 19,314 lbs/day = 3,524.8tpy, kiln unit_id 85485413=2,567.68, thus, this kiln must reduce from 2,175.42 to 957.12tpy"
10003,,NOX,,34.65,,,,,Y,A,588311,,,,"! reduce total NOX facility-wide to 1,650 tpy"
10005,,NOX,,61.58,,,,,Y,A,2685111,41230813,,,"! switching from #6 to nat gas, reduce NOX from 13.0133 to 5"
10005,,PM2_5,,52.49,,,,,Y,A,2685111,41230813,,,"! switching from #6 to nat gas, reduce PM25 from 3.01 to 1.43"
10005,,SO2,,99.63,,,,,Y,A,2685111,41230813,,,"! switching from #6 to nat gas, reduce SO2 from 64.1128 to 0.24"
10005,,NOX,,64,,,,,Y,A,2685111,41230413,,,"! switching from #6 to nat gas, reduce NOX from 13.8885 to 5"
10005,,PM2_5,,55.45,,,,,Y,A,2685111,41230413,,,"! switching from #6 to nat gas, reduce PM25 from 3.21 to 1.43"
10005,,SO2,,99.65,,,,,Y,A,2685111,41230413,,,"! switching from #6 to nat gas, reduce SO2 from 68.4248 to 0.24"
13099,,SO2,,64.94,,,,,Y,R,931711,47950613,,,! reduce unit to match 677 total from GA DEP
13099,,SO2,,55.89,,,,,Y,R,931711,47949213,,,! reduce unit to match 677 total from GA DEP
13179,,PM2_5,,100,,,,,Y,R,553111,48251513,,,"! converting to natural gas, zero out, from GA DEP"
13179,,SO2,,100,,,,,Y,R,553111,48251513,,,"! converting to natural gas, zero out, from GA DEP"
33003,,NOX,,40.83,,,,,Y,R,5209311,26128113,,,"! NH docket 3854, 72% reduction in CSAPR SCR, SNCR yields 93.8tpy target"
33009,,NOX,,48.73,,,,,Y,R,7868311,3382613,,,"! NH docket 3854, 72% reduction in CSAPR SCR, SNCR yields 54.68tpy target"
33019,,NOX,,40.62,,,,,Y,R,7853911,2824413,,,"! NH docket 3854, 72% reduction in CSAPR SCR, SNCR yields 50.52tpy target"
36001,,NOX,,2.19,,,,,Y,A,8105211,4818313,,,"! ISIS controls -replacing wet kilns with new, controlled kilns:  LafargeN.A. OVERRIDE LaFarge Consent decree (50%): per call w/ Elineth 1/12/11: leave existing plant, but add controls. email 1/13/11, 5:50pm: docketID=3857, target=4309tpy"
36001,,SO2,,74.8,,,,,Y,A,8105211,4818313,,,"! ISIS controls -replacing wet kilns with new, controlled kilns:  LafargeN.A. OVERRIDE LaFarge Consent decree (90%): per call w/ Elineth 1/12/11: leave existing plant, but add controls. email 1/13/11, 5:50pm: docketID=3857, target=2444tpy"
51019,,SO2,,80.79,,,,,Y,A,4183311,32655713,,,"! cdate=12/31/2011: GPBigIslandLLC: Unit is subject to a BART permit limit requiring a wet scrubber by 01/01/2012 and a limit of no more than 219 tpy SO2.: 12/2, 1:57pm email from Doris McLeod (VA DEQ): docketID=3840"
51041,,SO2,,82.66,,,,,Y,A,5795411,21591913,,,"! cdate=12/31/2009: DuPontDeNemoursEI&CompanyIncJame: SO2 limitation of 123 tpy SO2 required by the Dupont federal consent order.  Facility has upgraded to meet the limitation.: 12/2, 1:57pm email from Doris McLeod (VA DEQ): docketID=3840"
51121,,SO2,,53.74,,,,,Y,A,5748511,21782713,,,"! cdate=12/31/2008: VirginiaTech: Voluntary installation of dry lime scrubbing in 2008: 12/2, 1:57pm email from Doris McLeod (VA DEQ): docketID=3840, target=243tpy"
51133,,SO2,,23.84,,,,,Y,A,6437411,58416213,,,"! OmegaProteinInc: The facility took a fuel S content limit in a permit dated 6/17/2010 as well as a permit limit of 210 tpy SO2 for the combined emisisons of point 2 and point 3.: 12/2, 1:57pm email from Doris McLeod (VA DEQ): docketID=3840"
51133,,SO2,,23.84,,,,,Y,A,6437411,58416313,,,"! OmegaProteinInc: The facility took a fuel S content limit in a permit dated 6/17/2010 as well as a permit limit of 210 tpy SO2 for the combined emisisons of point 2 and point 3.: 12/2, 1:57pm email from Doris McLeod (VA DEQ): docketID=3840"